{"id":439,"date":"2023-01-15T01:00:29","date_gmt":"2023-01-15T01:00:29","guid":{"rendered":"https:\/\/civilsmithllc.com\/?p=439"},"modified":"2024-01-04T16:08:51","modified_gmt":"2024-01-04T16:08:51","slug":"triumph-sheets-paper-products-by-rail","status":"publish","type":"post","link":"https:\/\/civilsmithllc.com\/?p=439","title":{"rendered":"Firestone Building Products &#8211; Alabama"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_row _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_text _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<p><strong>Tuscumbia, Alabama<\/strong><br \/><span>Firestone Building Products doubled their rail capacity for receiving a new bulk commodity by rail .\u00a0 This facility has received plastic resin by rail for two decades and this\u00a0rail expansion represents significant new rail traffic to their Tuscumbia, Alabama facility.\u00a0 This project would include detailed coordination with Firestone&#8217;s mechanical engineering consultant, Quad Plus, as they managed the project to include manifold piping design along and over the proposed new tracks.<\/span><\/p>\n<p><span><\/span><\/p>\n<p><span>The CivilSmith team managed all aspects of the rail portion of the rail\u00a0expansion project to include surveying, geotechnical exploration, detailed track and track roadbed grading design and approval, permitting, project specifications development, bidding services, and construction phase services.\u00a0CivilSmith worked closely with Firestone&#8217;s project management consultant Quad Plus.\u00a0 Project construction phasing plans and scheduling were required during the final stages of construction to insure that Firestone would have a sufficient of raw materials to supply their operation.<\/span><\/p>\n<p><span><\/span><\/p>\n<p><span>CivilSmith coordinated all efforts between the industry and other stakeholders to include the adjacent landfill, Norfolk Southern, mechanical design team, and others as needed.\u00a0 Geotechnical exploration revealed a suspected old sink hole area that required remediation prior to preparating of the track roadbed.\u00a0 CivilSmith coordinated with S&amp;ME to include their recommendations into the overall project bid documents and specifications.\u00a0 The project also included the design and specifications for a new at-grade industrial drive crossing for adjacent landfill usage with heavy-duty dump trucks.<\/span><\/p>\n<p><span><strong><u>Track Contruction:<\/u><\/strong>\u00a0 Shelton&#8217;s Railroad Construction<br \/><strong><u>Surveying Services:<\/u><\/strong>\u00a0LandPro Surveying<br \/><strong><u>Geotechnical Services:<\/u><\/strong>\u00a0S&amp;ME<br \/><strong><u>Mechanical Engineering &amp; Project Management:<\/u><\/strong>\u00a0 Quad Plus<\/span><\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_text _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; link_option_url=&#8221;https:\/\/earth.google.com\/web\/@34.69099234,-87.65754956,369.34914523a,11.54742622d,35y,-94.06273587h,29.96535184t,0.0001r?utm_source=earth7&#038;utm_campaign=vine&#038;hl=en&#8221; link_option_url_new_window=&#8221;on&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h6>Interactive Aerial Imagery (Google Earth)<\/h6>\n<p>[\/et_pb_text][et_pb_text _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h6>Project Photo Gallery<\/h6>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_image src=&#8221;https:\/\/civilsmithllc.com\/wp-content\/uploads\/2023\/07\/Before-01-690&#215;330-1.jpg&#8221; alt=&#8221;Construction Phase&#8221; title_text=&#8221;Before 01 690&#215;330&#8243; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; caption_text=&#8221;Before Construction&#8221; enable_caption_text=&#8221;on&#8221; image_details_padding=&#8221;||10px||false|false&#8221; image_caption_font=&#8221;Raleway|700|on||||||&#8221; image_caption_color=&#8221;#3C3F40&#8243; image_caption_size=&#8221;15px&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_image][et_pb_image src=&#8221;https:\/\/civilsmithllc.com\/wp-content\/uploads\/2023\/06\/Construction_Phase-2.jpg&#8221; alt=&#8221;Construction Phase&#8221; title_text=&#8221;Construction_Phase&#8221; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; enable_caption_text=&#8221;on&#8221; image_details_padding=&#8221;||10px||false|false&#8221; image_caption_font=&#8221;Raleway|700|on||||||&#8221; image_caption_color=&#8221;#3C3F40&#8243; image_caption_size=&#8221;15px&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_image][et_pb_image src=&#8221;https:\/\/civilsmithllc.com\/wp-content\/uploads\/2023\/06\/After_Xing-2.jpg&#8221; alt=&#8221;Construction Phase&#8221; title_text=&#8221;After_Xing&#8221; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; enable_caption_text=&#8221;on&#8221; image_details_padding=&#8221;||10px||false|false&#8221; image_caption_font=&#8221;Raleway|700|on||||||&#8221; image_caption_color=&#8221;#000000&#8243; image_caption_size=&#8221;15px&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_image][et_pb_image src=&#8221;https:\/\/civilsmithllc.com\/wp-content\/uploads\/2023\/06\/After_02_690x330-2-e1689770281747.jpg&#8221; alt=&#8221;Completed Rail Yard Expansion&#8221; title_text=&#8221;After_02_690x330&#8243; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; enable_caption_text=&#8221;on&#8221; image_details_padding=&#8221;||10px||false|false&#8221; image_caption_font=&#8221;Raleway|700|on||||||&#8221; image_caption_color=&#8221;#3C3F40&#8243; image_caption_size=&#8221;15px&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_image][et_pb_image src=&#8221;https:\/\/civilsmithllc.com\/wp-content\/uploads\/2023\/06\/After_01_690x330-3-e1689770335385.jpg&#8221; alt=&#8221;Construction Phase&#8221; title_text=&#8221;After_01_690x330&#8243; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; enable_caption_text=&#8221;on&#8221; image_details_padding=&#8221;||10px||false|false&#8221; image_caption_font=&#8221;Raleway|700|on||||||&#8221; image_caption_color=&#8221;#3C3F40&#8243; image_caption_size=&#8221;15px&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_image][et_pb_image src=&#8221;https:\/\/civilsmithllc.com\/wp-content\/uploads\/2023\/06\/After_03_690x330-2.jpg&#8221; alt=&#8221;Construction Phase&#8221; title_text=&#8221;After_03_690x330&#8243; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; enable_caption_text=&#8221;on&#8221; image_details_padding=&#8221;||10px||false|false&#8221; image_caption_font=&#8221;Raleway|700|on||||||&#8221; image_caption_color=&#8221;#3C3F40&#8243; image_caption_size=&#8221;15px&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_image][et_pb_image alt=&#8221;Construction Phase&#8221; title_text=&#8221;Before_01_690x330&#8243; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; enable_caption_text=&#8221;on&#8221; image_details_padding=&#8221;||10px||false|false&#8221; image_caption_font=&#8221;Raleway|700|on||||||&#8221; image_caption_color=&#8221;#3C3F40&#8243; image_caption_size=&#8221;15px&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_image][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Firestone Building Products doubled their rail capacity for receiving a new bulk commodity by rail .  This facility has received plastic resin by rail for two decades and this rail expansion represents significant new rail traffic to their Tuscumbia, Alabama facility.  <\/p>\n","protected":false},"author":1,"featured_media":469,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","footnotes":""},"categories":[3],"tags":[26,22,37,24,27,18,67,50,17,38,20,25,28,19,13,23],"class_list":["post-439","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrial","tag-conceptual-rail-design","tag-norfolk-southern-rail-design","tag-plastic-by-rail","tag-rail-bidding-services","tag-rail-cost-estimating","tag-rail-design","tag-rail-design-alabama","tag-rail-siding-design","tag-rail-spur-design","tag-rail-served-plastic","tag-railroad-design","tag-track-construction","tag-track-cost-estimating","tag-track-design","tag-track-engineering","tag-track-specifications"],"_links":{"self":[{"href":"https:\/\/civilsmithllc.com\/index.php?rest_route=\/wp\/v2\/posts\/439","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/civilsmithllc.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/civilsmithllc.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/civilsmithllc.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/civilsmithllc.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=439"}],"version-history":[{"count":36,"href":"https:\/\/civilsmithllc.com\/index.php?rest_route=\/wp\/v2\/posts\/439\/revisions"}],"predecessor-version":[{"id":1178,"href":"https:\/\/civilsmithllc.com\/index.php?rest_route=\/wp\/v2\/posts\/439\/revisions\/1178"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/civilsmithllc.com\/index.php?rest_route=\/wp\/v2\/media\/469"}],"wp:attachment":[{"href":"https:\/\/civilsmithllc.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=439"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/civilsmithllc.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=439"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/civilsmithllc.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=439"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}